McFour Ltd have been working with a private client on the decommissioning, filling and capping off of an old Borehole / well.
The borehole was decommissioned, the borehole / well was carefully taken down to 1 m below ground level to allow a C35 concrete pour for a 200 mm thick reinforced steel & concrete slab to be installed to seal the old well and cap it off.